At this stage, the roof may be put in — or not less than loaded— prior to setting up the doorways and windows. This enables the building envelope to settle. Occasionally this may result in a dependency not becoming merged, plus a fresh new PR getting designed for that dependency. https://preechaconcretepile82592.dm-blog.com/32568975/5-tips-about-pile-you-can-use-today